Angus Place East Project
Centennial Coal
This project will be completed in March 2015 and included the design, construction and commissioning of the following;
-
66kV ASP1 Contestable Works – 66kV Endeavour Energy Supply Point
-
Substation 0 – 66kV Endeavour Energy Switching Station
-
66kV Transmission Lines – 4.5km of buried 66kV cables, earth cables and fibre optic communications cables
-
Substation 1 – 66/11kV 15MVA Substation
-
11kV Transmission Lines – 1km of buried 11kV cables, earth cables and fibre optic communications cables
-
Substation 2 – 11kV Switchroom
-
11kV Borehole Cables – 400m of suspended 11kV cables, fibre optic communications cables, telephone cables and control cables
-
Substation 3 – Pit Bottom 11kV Switchboard
-
PLC, SCADA and HMI systems integration
-
Earthing systems
Narrabri Coal Project
Whitehaven Coal
This project was completed in 2012 and included the design, construction and commissioning of the following;
-
66/11kV Twin 10MVA Substation
-
Buried 11kV cables, earth cables and fibre optic communications cables across the site
-
Vent Fan 11kV Switchroom
-
11kV/415V Distribution Substations across the site
-
PLC, SCADA and HMI systems integration
-
Earthing systems
Airly Mine Project
Centennial Coal
This project will be completed in 2010 and included the design, construction and commissioning of the following;
-
66kV ASP1 Contestable Works – 66kV Endeavour Energy Supply Point
-
Substation 0 – 66kV Endeavour Energy Switching Station
-
Substation 1 – 66/11kV 16MVA Substation
-
11kV Transmission Lines – Buried 11kV cables, earth cables and fibre optic communications cables across the site
-
Substation 2 – 11/415V 2.5MVA Substation and 415V Switchroom
-
11kV Power Factor Correction
-
PLC, SCADA and HMI systems integration
-
Earthing systems
Abel Mine Project
Donaldson Coal
This project will be completed in 2010 and included the design, construction and commissioning of the following;
-
33/11kV Twin 10MVA Substation
-
Buried 11kV cables, earth cables and fibre optic communications cables across the site
-
Boxcut 11kV Switchroom
-
11kV/415V Distribution Substations across the site
-
PLC, SCADA and HMI systems integration
-
Earthing systems